Secure and Controlled Facility Construction in Denver
Nyback Construction provides secure facility and SCIF construction services across the Denver metro area and Front Range. We support projects aligned with ICD 705 requirements, including RF shielding, acoustic isolation, and controlled access systems. These projects require coordination, documentation, and consistent execution throughout construction.
ICD/ICS 705
strict compliance
TEMPEST
signal mitigation
SCIF and Secure Facility Construction
We support the construction of SCIFs and other secure facilities that require compliance with federal standards and controlled construction practices. This includes coordination of RF shielding systems, acoustic assemblies, and secure access controls, along with documentation and inspection requirements throughout the project.
Pre-Construction Coordination for Secure Facilities
Acoustic Isolation
RF Shielding
Access Controls
Construction of assemblies designed to control sound transmission and meet project-specific acoustic requirements.
Coordination and installation of RF shielding systems, including conductive materials and assemblies used in SCIF and secure environments.
Installation of physical security components, including access systems and hardware aligned with secure facility requirements.
NAICS: 541690 | 541611 | 541330 | 236220 | CAGE: 7PTR7 | UEI : D6QSFBCN97A1
Secure construction projects require early coordination to align design requirements, systems integration, and compliance expectations before work begins.
Discuss a Secure Project
If you are planning a secure or controlled facility, we are available to discuss scope, requirements, and coordination approach. Sensitive projects are handled with discretion.
